Back To Gallery: Gallery
Insufficient bearing 2 Aug 2012
Insufficient bearing Contractor failed to provide bearing for the bottom chord as required by the manufacturer. Bottom chord was split when contractor attempted to toenail same to ledger.
framing
Insufficient bearing Gallery: Gallery Description: Contractor failed to provide bearing for the bottom chord as required by the manufacturer. Bottom chord was split when contractor attempted to toenail same to ledger.
Views: 1922 Loves: 0 love it! Tag Count: 1
Additional Info File Size: 83.27 KB Dimensions: 800x600 Created: 2 Aug 2012 Updated: 6 Aug 2012