Back To Gallery: Gallery
Inadequate Clearance 2 Aug 2012
Inadequate Clearance The contractor failed to furnish the required 2" clearance between the wall studs and the chimney.
framing safety
Inadequate Clearance Gallery: Gallery Description: The contractor failed to furnish the required 2" clearance between the wall studs and the chimney.
Views: 1987 Loves: 0 love it! Tag Count: 2
Additional Info File Size: 56.16 KB Dimensions: 450x600 Created: 2 Aug 2012 Updated: 12 Aug 2012